1. TMP Planning Form

This form is used to provide supplementary information to approvers and reviewers as well as other impacted PCBUs. Any information provided in this TMP Planning Form must be consistent (and read in conjunction) with the associated General TMP form and TMD form/s.

1.1. Risk Assessment Information

Please upload any documents and Evidence using the upload button at the bottom of the page.

1.1. Risk Assessment Information

1.1.1. Supplementary Risk Assessment Documentation


If Option 1.1.1 (a supplementary attached risk assessment) is not selected, table 1.1.2 must be compiled

1.1.2.  Identified Risks and Controls

Commentary on Selection

(in accordance with Hierarchy of Controls)

1.2. Authorisations








1.2.8 Temporary Road Safety Barrier Systems



*Installation Designer role is defined in AS/NZS 3845 Part 1:2015 section 1.5.1 (e). “Qualified” indicates Waka Kotahi Temporary Barrier Design Qualification (or ASHTAS equivalent)

**Independent Reviewer may be a qualified Installation Designer or other suitably qualified person

1.3 Delay Calculation Information-

Provide supplementary delay calculation information or logic to support outputs described in the Onsite Form

1.5 Associated TMP Forms- Provide details of the number and titles of associated TMD forms with this planning form